Hess lighTram 10 Plug '2021–pr.

Hess lighTram 10 Plug '2021–pr.
Hess lighTram 10 Plug '2021–pr.
Hess lighTram 10 Plug '2021–pr.
Hess lighTram 10 Plug '2021–pr.

The batteries are charged overnight or during breaks in operation at the bus depot.

Hess lighTram 12 OPP Switzerland '2021Prodotto in 4 copie

Hess lighTram 12 OPP [Switzerland] '2021
Hess lighTram 12 OPP [Switzerland] '2021
Hess lighTram 12 OPP [Switzerland] '2021
 

Hess lighTram 19 DC France '2021Prodotto in 34 copie

Hess lighTram 19 DC [France] '2021
 
 
 

Also known as Hess Swisstrolley 5.

Hess lighTram 19 OPP Switzerland '2021Prodotto in 2 copie

Hess lighTram 19 OPP [Switzerland] '2021
Hess lighTram 19 OPP [Switzerland] '2021
 
 

Hess lighTram 25 DC '2021Prodotto in 11 copie

Hess lighTram 25 DC '2021
 
 
 

Hess lighTram 12 Plug '2022–pr.

Hess lighTram 12 Plug '2022–pr.
Hess lighTram 12 Plug '2022–pr.
 
 

Hess lighTram 25 TOSA Australia '04.2022Prodotto in una singola copia

Hess lighTram 25 TOSA [Australia] '04.2022
Hess lighTram 25 TOSA [Australia] '04.2022
Hess lighTram 25 TOSA [Australia] '04.2022
Interni Hess lighTram 25 TOSA [Australia] '04.2022
  • Project owner – Brisbane City Council;
  • Operator – Transport for Brisbane;
  • Length of route – 21km;
  • Vehicles – Initial fleet: 60 lighTram® 25;
  • Vehicle capacity – 150 people in comfort, 170 in event mode;
  • Average km/day (weekdays) – 350 kilometres;
  • Maximum speed – 90 kilometres per hour;
  • Operation – 7 days a week, 24 hours on weekends;
  • Charging – 600kW flash charging and 50kW slow charging (metro depot);
  • Pilot metro delivery – April 2022;
  • Operational commencement – Late 2024;
  • Local partner – Volgren.